I spent some time this week installing the Kitaco Rearsets on the CRF50. It took quite a bit of tweaking to fit these pieces due to the tight clearances between the kick start lever and swingarm. I think this is due to the kit originally being designed for the monkey, but in the end… it was worth it. =)
Archive for January, 2009
Making progress…
Friday, January 30th, 2009CRF50 Monkey Baja Motard Project
Tuesday, January 27th, 2009This past weekend I decided to get some work done on the CRF50. Here’s the intial mock up with a Baja Monkey front end and a +2 G-craft swing arm.
Trail Bikes CDI Harness Adapter
Monday, January 26th, 2009A Leisurely Sunday Ride
Sunday, January 18th, 2009I took the monkey out today with no destination in mind, so I just rode and rode until I ended up at the Starbucks on Melrose. I chatted with some cool people and afterwords decided to visit my girlfriend in Century City. She followed me back home and took some pictures. =)
Over Racing Rearset Install
Sunday, January 11th, 2009I ran into quite a bit of problems installing the Over Racing Rearsets (backstep) on the Jincheng frame. I used 8mm derlin spacers between the T plate and frame which I made from a chain roller. This however created more complications… (more…)
Place holder…
Monday, January 5th, 2009Rust Removal By Electrolysis
Sunday, January 4th, 2009June 08
I opted to use electrolysis to remove the rust from inside the tank mainly because I’ve seen others doing it with good results and it does not remove metal in the process. Afterwords, I sealed the inside of the tank with POR15.








